Ostrake NDA signed · A subsidiary of a large French automotive group · November 2023 to January 2026
An application portal that checks 15 rules on every file, in production since July 2024
The app where car recycling centers apply to join a network. Two forms, 15 automatic checks, and a back office for the team that reviews and audits the centers.
- 15rules checked on every application
- 4 July 2024in production
- 190 hof my work, from November 2023 to January 2026

Situation Every application went through the team, from the file to the audit.
The client runs a network of car recycling centers. A center that wants to join the network sends an application. The client’s team reviews it, audits the site, then accepts or refuses the center. In November 2023, I joined the project to build the app for this process.
Mission One app, from the form to the audit.
I had to build the app, then evolve it with the regulations and the team’s requests.
Actions
- A first version in 60 hours. The data model, the application form, a second form opened with a code sent by email, the back office, accounts and emails. Delivered for testing on 25 January 2024, on the promised date.
- The new regulations. In April and May 2024, I redid the forms. The first one runs over 3 pages and checks the company numbers before letting the center continue.
- 15 automatic refusal rules. As soon as an application is sent, the app checks the center’s permits, certificates and recycling rates. If a rule fails, the center gets an email that explains why. When the team refuses a file by hand, it must give a reason.
- Two roles. Assistants sort the applications. Network managers audit sites in the field with their phones, so I made the whole app usable on mobile in September 2024.
- An export that holds up under load. When the file got too big, I moved its generation to the server. It now arrives by email.
- Renewals. In January 2026, I simplified the first application and added renewals, sent to one center or to several at once.
What I fixed
- After the move to the final web address, centers with an application in progress could no longer open their link. I fixed it the same evening, on 30 August 2024.
- A number typed with a space as the thousands separator was not saved, with no error message. I fixed the format of 24 fields.
How I worked
Every change went through a test version first. The client’s project manager approved each item before it went to production. I announced each release in the project chat. When a choice had a trade-off, I explained the options in writing.
Results
- In production since 4 July 2024, and still evolving in 2026.
- Every application checked against 15 rules as soon as it is sent.
- 190 hours of work, from November 2023 to January 2026.
- One of the three apps I built for this client, with the used parts site.